6 Commissioning
DANGER
Danger to life due to electric voltage
High voltages are present inside the device. When touching parts that are live, there is a risk of
death. If there is visible damage, there is a risk of death when commissioning the device.
► Work on the open device must only be carried out by trained specialist personnel.
► Before carrying out any installation and maintenance work, switch the device off and disconnect
it from the current supply.
– After switching off, wait about 60 seconds and then disconnect all cables (power cable at the
end).
► Never open the device with the current supply connected.
► Secure the current supply against unauthorized or unintentional reactivation.
► Do not insert any objects into the vent openings.
► Never open an external power supply pack.
► Never operate an open or defective device.
► Secure a defective device against accidental operation.
► Protect the device against moisture.
Switching on QMS 700 only with QMA cable
Only switch on QMS 700 with the QMA cable properly connected.
Factory setting
Pfeiffer Vacuum configures complete systems optimally at the factory. Therefore, do not
change anything without good reason.
Data transmission
If the yellow LED of the Ethernet connection remains dark, a problem has occurred during
data transmission. Check the cable and components in the connection path, as well as the
correct PC configuration (software, firewall status etc.).
Prerequisites
● Mains switch of QMS 700 set to OFF
● All system components installed according to operating instructions
● Vacuum conditions and system conditions tested and fulfilled
● Wiring of system components established according to operating instructions
● LAN connection to the PC (directly or via a network) established
● Mains connection of QMS 700 established
● PC ready for operation and prepared according to software documentation
● Limits of use complied with
● Relevant operating instructions of other system components observed
Switching on system
1. Set the mains switch on the front panel of QMS 700 to ON (I).
– The "DC" LED lights up out and QMS 700 is ready for operation.
2. Switch on the PC.
3. Start the QUADERA software.
– Flickering of the yellow LED at the Ethernet connection of QC 700 indicates that data ex-
change is in progress.
4. Carry out the further commissioning steps in QUADERA.
Commissioning
48/70