![Pfeiffer Vacuum HIQUAD QMG 700 Скачать руководство пользователя страница 44](http://html1.mh-extra.com/html/pfeiffer-vacuum/hiquad-qmg-700/hiquad-qmg-700_operating-instructions-manual_1534983044.webp)
5.2.1 Installing system chassis as 19" rack module
Procedure
1. Push the unit into the control cabinet according to DIN 41 494.
2. Fasten the unit using the corresponding screws.
3. Always tighten all screws and strain reliefs to ensure reliable contact making and prevent plugs
from falling out.
5.2.2 Installing system chassis as tabletop unit
Required tools
● Screwdriver
Required material
● 4 plastic feet
Fig. 42:
Insert plastic feet in the bores
Fig. 43:
Press in locking pins
Procedure
1. Turn over the unit.
2. Insert the plastic feet into the bores provided in the bottom plate.
3. Push the protruding locking pins in the plastic feet all the way in using a screwdriver handle part.
4. Turn over the unit again.
5.3 Installing or replacing plug-in modules in system chassis
NOTICE
Damage to unit from electrostatic discharge
Electrostatic discharge damages electronic components. Defects resulting from failure to comply with
this warning shall result in loss of any warranty claim entitlement.
► Carry out all work on ESD-protected workstations only, in compliance with the appropriate work-
ing methods.
► When the unit is open, take suitable precautions against electrostatic charges.
► Always store electronic units and components in anti-static packaging.
► Observe EN 61340, Parts 5-1 and 5-2 – Protection of electronic devices from electrostatic phe-
nomena.
Required tools
● Screwdriver "PZ" type, size 1
Installation
44/70
Содержание HIQUAD QMG 700
Страница 70: ...BG5400 ed B Date 2210 P N BG5400BEN...