![Peri SKYDECK Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/peri/skydeck/skydeck_instructions-for-assembly-and-use_1529937018.webp)
16
M
R
K / P
R
K 2
25
M
R
K / P
R
K 2
01
,5
MRK
PRK
62,5
MRK
PRK
62,5
MRK
PRK
75
MRK
PRK
75
125
2
25
0
20
15
23
5
23
5
M
R
K / P
R
K 2
01
,5
M
R
K / P
R
K 2
01
,5
M
R
K / P
R
K 2
25
625
MRK / PRK 137,5
125
20
15
1375
1500
23
0
0
M
R
K / P
R
K 2
01
,5
M
R
K / P
R
K 2
01
,5
M
R
K / P
R
K 2
01
,5
MRK / PRK 150
MRK / PRK 137,5
M
R
K / P
R
K 2
3
0
M
R
K / P
R
K 2
3
0
MRK / PRK 150
2
25
0
1500
375
0
M
R
K / P
R
K 2
25
M
R
K / P
R
K 2
25
MRK / PRK 150
MRK / PRK 150
750
028390
111811
028400
111812
028380
111813
028350
111814
028460
111815
028360
111816
028470
111817
SKYDECK Panel Slab Formwork
Instructions for Assembly and Use – Standard Configuration
A3 System dimensions
Overview of the required frames:
MRK with the use of MULTIPROP Towers
PRK with the use of PEP Props
Frames
MRK
Item no.
PRK
Item no.
SKYDECK system
– Inset beam at wall beginning with 75 cm panel span.
– Inset prop at wall beginning with Combihead.
– Panel span 75 cm.
– Inset beam at wall beginning with 150 cm panel span.
– Panel span 150 cm.
– Inset prop at wall beginning under SLT 225 with Prophead
or Combihead.
– SLT 225 on Prophead or Combihead.
– Use of Cantilever Beam SLT 375 on Prophead/Combihead
or corner tables.
– SLT 225 on Dropheads.
75 Steel
137.5 Steel
150 Steel
201.5 Alu
225 Alu
230 Alu
62.5 Steel
Table A3.02
Fig. A3.01
Fig. A3.02
Fig. A3.03
SKYDEKC AuV_ex_791458.indb 16
13.12.16 16:54
Содержание SKYDECK
Страница 1: ...SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration Edition 09 2016...
Страница 25: ...23 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...
Страница 47: ...45 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...
Страница 87: ...85 SKYDECK Panel Slab Formwork Instructions for Assembly and Use Standard Configuration...