
HPVA Series Operator’s Manual
Adjusting the Metering Valves
Mar 2011
6-13
7. On the Manual Control screen, open the gas line valve, for example, valve 6 for Gas Line 1.
8. Slightly open the metering valve.
9. Observe the Manifold pressure (
Pm
) shown on the Manual Control screen. The pressure should
rise approximately 1 bar every 10 to 20 seconds.
10. Adjust the metering valve as necessary to obtain the appropriate gas flow.
11. Close the valves on the Manual Control screen, then open valve 2 to vent.
Содержание HPVA Series
Страница 1: ...HPVA Series High Pressure Volumetric Analyzer Operator s Manual V4 0 P02 42801 01 March 2011...
Страница 4: ......
Страница 8: ...Table of Contents HPVA Series Operator s Manual iv Mar 2011...
Страница 20: ...Specifications HPVA Series Operator s Manual 1 12 Mar 2011...
Страница 52: ...Definitions of Fields in the System Windows HPVA Series Operator s Manual 2 32 Mar 2011...
Страница 66: ...Displaying Experiment Data HPVA Series Operator s Manual 3 14 Mar 2011...
Страница 70: ...Setting the Sample Bath Temperature HPVA Series Operator s Manual 4 4 Mar 2011...
Страница 98: ...Ordering Informatioin HPVA Series Operator s Manual 7 2 Mar 2011...
Страница 120: ...Analyzing the Results HPVA Series Operator s Manual B 18 Mar 2011...
Страница 124: ...Index HPVA Series Operator s Manual Index 4 Mar 2011...