8
Start-up: “Vitamin Addition by Weight”
Equipment:
You will need the following items to get started
:
Parker P/N
Description
Quantity
Appropriate Vitamin Reservoir
1 pc
200-DARY-714Q
VitaPump System w/Q1 Piston Head,
Includes the following Items:
100-VIPER6
Mettler ICS425 Scale, 6 Kg x 0.1 gm
1 pc
080-072ICS
Mettler Balance Interface cable
1 pc
080-074
Cable Set, Alarm, Status & Remote On/Off
1 pc
080-095A
Printer Kit, includes Printer, Cable, 6 rolls Paper
1 kit
Also
needed:
400-217
#17 Food Grade Tygon Tubing
50 ft. (1 box)
400-002M
Sinker, SS, for #17 Tubing
1 pc
Hardware Setup:
1. Unpack all the components, visually identify and inspect for damage.
2. At the metering location, place the Balance to the far left, with the Vitamin Reservoir on it.
Place the VitaPump to its right and the Printer, if you are using one, to the right of the pump.
This arrangement can be varied depending on the installation location. The VitaPump and
Balance in most dairy installations are in an enclosed cabinet to protect them from getting
wet.
3. Connect the interface cable between the VitaPump. Connect the DB9 end of the cable to
the “S1” connector on the rear panel of the VitaPump. The other end of the cable plugs into
the round M12 connector on the bottom of the scale’s terminal. Connect the Printer cable
between the “Printer” connector on the rear panel of the VitaPump and the connector on the
Printer.
4. Connect the Alarm, Status and Remote On/Off Cable set to the “External I/O” connector on
the rear of the VitaPump. The Remote On/Off Cable can be connected to your PLC flow
control switch. This is a normally open contact closure connection; no power is required nor
should be supplied. It acts as a ‘fail-safe’ for your system as the VitaPump will not meter
vitamins if this feature is enabled and the switch is in the open position. Connect the Alarm
Cable to the PLC or remote alarm control. This provides a low current, 5volt control signal, it
will not drive the alarm on its own, only control it.
5. Plug in and power up the system, Balance, Printer and VitaPump, in that order please.
6. Cut enough of the #17 tubing to connect the vitamins and the VitaPump, placing a Sinker on
the end of the tubing to help hold it at the bottom of the bottle. Secure the tubing to the left
side port of the pump head with a cable tie or clamp.
7
Connect and secure tubing to the right port of the pump head and route this to the injection
point of your process stream and attach it appropriately.
Содержание VitaPump
Страница 1: ...VitaPump System Installation Operation Maintenance Instructions ...
Страница 19: ...19 ...
Страница 21: ...21 2 0 Vitamin Metering Edit Alarm ...
Страница 23: ...23 3 0 Metering Exec ...
Страница 24: ...24 4 0 Setup Edit ...
Страница 34: ...34 Appendix A Tandem Pump Head Installation and Maintenance ...
Страница 37: ...37 TANDEM Dual Channel Peristaltic Pump Parts Identification ...
Страница 39: ...39 Appendix B FMI Q1 Pump Head Installation and Maintenance ...
Страница 40: ...40 ...
Страница 41: ...41 ...
Страница 42: ...42 ...
Страница 43: ...43 ...
Страница 44: ...44 ...