6 Options
980-001-0240B
FrameSaver NP 110 User’s Manual - Installation Guide
6-25
November 2000
Configuration
With the ISDN connections and base unit connections completed, the FrameSaver NP
110 is ready to be powered on and the ISDN Adapter configured for operation.
Power On with
Connections
Completed
Power the unit on by connecting the power cord and plugging it into an appropriate AC
outlet. The FrameSaver NP 110 with ISDN will complete its power-on self-test se-
quence with front panel LED indications as follows:
a. The UNIT POWER LED will light immediately and stay on.
b. The UNIT READY and ISDN READY LEDs will flash while the
unit performs its self-test (test duration - approximately 45 seconds).
c. The UNIT READY and ISDN READY LEDs will be ON steady after
successful completion of the self-test.
d. The NETW ALARM and UNIT FRM MGMT LEDs should not be
flashing together.
e. All other LED indications should be ignored at this time.
If the LED indications are not as described above, refer to section 5, “Diagnostics” in
this manual.
If operation looks normal, proceed by establishing a Management Session and entering
the operating parameters as described in Parameter Setting on the next pages of this
section in the manual, or contact the Network Control Center to have the parameters
set remotely.
NOTE: If the Dial Line has not been connected to the FrameSaver NP 110 prior to
powering the unit on, the unit will issue a Dial Line Failure In-Band Trap to the Trap
Manager after it completes its Modem and Dial Line self test.
Содержание FrameSaver NP 110
Страница 17: ...1 Preface 1 6 FrameSaver NP 110 User s Manual Installation Guide 980 001 0240B November 2000 ...
Страница 107: ...5 Diagnostics 5 40 NetPath 110 User s Manual Installation Guide 980 001 0240B November 2000 ...
Страница 175: ...Appendix A 18 FrameSaver NP 110 User s Manual Installation Guide 980 001 0240B November 2000 ...