4 Operation
4-2
FrameSaver NP 110 User’s Manual - Installation Guide
980-001-0240B
November
2000
Power On
With all the connections completed, the FrameSaver NP 110 is ready to be powered on.
Proceed by holding in the recessed push button switch labeled “NVM RESET” on the
unit’s rear panel while plugging in the power cord and continue to hold the button for
approximately six (6) seconds. This will “clear” the unit’s NVM, resetting all the
configuration parameters to their default values. After the NVM Reset button is
released, the FrameSaver NP 110 will go through the power-on sequence as follows:
a. The UNIT POWER LED will light immediately and stay on.
b. The UNIT READY LED will flash while the unit performs its self-
test (test duration - approximately 60 seconds).
c. The UNIT READY LED will be ON steady after successful comple-
tion of the self-test.
d. The NETW ALARM and UNIT FRM MGMT LEDs should not be
flashing together.
e. All other LED indications should be ignored at this time.
If the LED indications are not as described above, refer to section 5 Diagnostics of this
manual.
NOTE: If the Dial Line has not been connected to the FrameSaver NP 110 prior to
powering the unit on, the unit will issue a Dial Line Failure In-Band Trap to the Trap
Manager after it completes its Modem and Dial Line self test.
Proceed to the next section, “Establish Management Session.”
Содержание FrameSaver NP 110
Страница 17: ...1 Preface 1 6 FrameSaver NP 110 User s Manual Installation Guide 980 001 0240B November 2000 ...
Страница 107: ...5 Diagnostics 5 40 NetPath 110 User s Manual Installation Guide 980 001 0240B November 2000 ...
Страница 175: ...Appendix A 18 FrameSaver NP 110 User s Manual Installation Guide 980 001 0240B November 2000 ...