
980-001-0210K
NetPath 100 User’s Manual - Installation Guide
4-1
November 2000
4 Operation
This section contains configuration and operation information for basic NetPath 100.
Refer to Section 6, “Options” of this manual for installation, configuration and opera-
tion information for NetPath 100 Options such as the ISDN Adapter.
Configuration
NetPath 100 configuration consists of initially setting the T1, CSU parameters and the
WAN Management Channel’s DLCI address via the rear panel DIP Switches, via dial-
in VT-100 console connection or via direct connected VT-100 terminal. These param-
eters can also be reconfigured via in-band Telnet Management session after the initial
installation.
Additional parameters are configured via in-band Telnet, dial-in VT-100 console con-
nection or direct connected VT-100 terminal.
The configuration procedures to complete the installation using the DIP Switches for
initial settings, are presented in and should be performed in the following order:
•
Power the unit on while clearing NVM.
•
Use the DIP Switches to set the T1 Interface (CSU) parameters.
•
Use the DIP Switches to set the DS0 (Time Slot) configuration of the T1 link.
•
Use the DIP Switches to set the WAN DLCI address.
•
Establish management session.
•
Set other operating parameters.