
Appendix
A-12
NetPath 100 User’s Manual - Installation Guide
980-001-0210K
November
2000
Test Status
Test Status shows the highest priority test currently running. This is displayed on the
ISDN Status / Test screens.
Table A-12 Test Status
Display
Description
Lp to User
Loopback is in place at the User Port toward the User Circuit.
2047 Payld to User
2047 pattern BERT is being sent toward the User Circuit.
Line Lp to Netw
Full T1 Line loopback in place at Network Port toward Network Circuit.
Payld Lp to Netw
Full T1 Payload loopback in place toward Network Circuit.
V.54 Lp to Netw
Loopback is in place at the User Port toward the Network Circuit, in response to a V.54
LoopUp code from the Network (only if DS0s are assigned to the User Port.)
QRSS to Netw
QRSS pattern BERT is being sent toward the Network Circuit.
Alt Ones to Netw
Alternating Ones pattern BERT is being sent toward the Network Circuit.
2047 Payld to Netw
2047 pattern BERT is being sent toward the Network Circuit.
Test Pkts to Netw
Link Test Packets (40 -1590 octets) are being sent toward the Network Circuit (only on
the DS0s assigned to the User Port.)