![Panasonic EBL512 G3 V1.1.x Скачать руководство пользователя страница 90](http://html.mh-extra.com/html/panasonic/ebl512-g3-v1-1-x/ebl512-g3-v1-1-x_operating-instructions-manual_267562090.webp)
Panasonic Electric Works Nordic AB
MEW01349
Rev: -
Operating Instructions Fire alarm system EBL512 G3, V1.1.x
88
Write zone numbers
(e.g. 001, 002, 003,
004)
Zones to be set in test mode
001 002 003 004
Press "
↵
" to start the test
mode.
"
"
Zones in test mode:
001 002 003 004 End test:
LED "Test mode" (L8)
will light up. Perform the
tests.
The zone(s) will stay in test mode until the test mode is ended
but after 60 minutes or if you press "Esc
menu", you will be logged out from menu H1.
Perform the test as quickly as possible, since the output(s) for routing equipment (fire brigade tx) are disabled
(also the parts of the zones in test mode, not visible for the test personnel, are disabled).
In order to shorten the testing time, any time delay for the detectors / zones in test mode will be "disabled",
i.e. fire alarm will be detected faster than normally.
In the tested alarm point, the LED will light up, and the LEDs "Fire" (L1) in the c.i.e. will light up approx. 10
seconds, then the alarm point will be automatically reset. The printer, if available, will print out every tested
alarm point (Zone: xxx Address: xx Time: HH.MM).
A sensor in test mode will not be able to activate fault.
After 60 minutes
or
"Esc Menu"
Zones in test mode:
001 002 003 004 End test:
(
NOTE! See chapter "The information area priority
order
", page 22 regarding priority order.)
You are no longer in menu
H1 but still in test mode.
(When required:
"Menu", "code")
Zones in test mode:
001 002 003 004 End test:
Press "
↲
" to end test.
"
↲
"
Please wait....
Test of routing equipment?
No
Yes
The LED "Test mode" is
turned OFF.
Some national regulations also require a routine test of the routing equipment.
Press press "
↵
" (i.e. select "No") for no test. If so, the monthly test is completed (see below).
or
Press "▼" and "
↵
" (i.e. select "Yes") to start such a test. If so, the following will happen in the system:
The c.i.e. "Fault tx" output will be de-activated (note that this output is
activated
in normal state),
indicated by the LED "Fault tx activated" (L13).
60 seconds count-down starts.
After 30 seconds, also the c.i.e. "Fire brigade tx" output (and corresponding programmable outputs
type "routing equipment") will be activated, indicated by the LED "Fire brigade tx delay" (L14).
After another 30 seconds, the test will be ended and the outputs and LEDs will return to "normal".
"▼" and "
↲
"
Test of routing equipment in progress.
nnn seconds left.
"nn" starts at 060 and will
count down to 000.
Monthly test is completed!
Press
"
↲
"
▒▒▒ menu
Scroll to another menu or
Содержание EBL512 G3 V1.1.x
Страница 2: ...This page has deliberately been left blank ...
Страница 161: ...This page has deliberately been left blank ...