Panasonic Electric Works Nordic AB
MEW01349
Rev: -
Operating Instructions Fire alarm system EBL512 G3, V1.1.x
151
34
Annual control
The building occupier is highly recommended, once a year, to do
some tests, beside the monthly tests. To avoid the Fault tx output(s) to
be activated, they can be disabled via menu H2/B9 (or via an open
door, se chapter "Open door", page 35.).
Regarding the fault condition, see chapters "Fault", page 52 and "Fault
messages", page 54.
NOTE!
Most of the faults have a delay.
Each control unit should be tested as follows:
Perform monthly test (menu H1).
Remove one battery fuse (e.g. F2 on the Main board 5010).
The following fault message is to be shown:
FAULT: Battery not connected CU xx
NOTE!
xx is depending on control unit (xx=00-29).
Put back the fuse and acknowledge the fault (menu H6).
Remove fuse F4 on the Main board 5010.
The following fault message is to be shown:
FAULT: Supervised output 0, CU xx
NOTE!
xx is depending on control unit (xx=00-29).
Put back the fuse and acknowledge the fault.
Check the manual call points (the glass). Take required
measures. Use the manual call point test key to activate fire
alarm.
Check some control outputs. Are they activated according
to programmed control expressions?