
15
Fume Extraction Ready Attachment
2. Install the Tube Locking Knob (item
¯
) loosely into its mounting hole.
3. Slide the straight end of the Tube (item
) into its mounting hole on the Hose Connector.
4. Adjust the Tube (item
) in position where the straight end is flush with the rear of the Hose
Connector (item
¬
) and the angled end is vertical to the Work Platform.
5. Tighten the Tube Locking Knob (item
¯
) to secure the Tube (item
) in position.
6. Connect a 7.6mm (3 inch) diameter, flexible air hose (not supplied) between the Hose Connector (item
¬
) and your fume extraction system.
Operation
1. Place a PCB assembly
(mounted on board holder,
fine adjustment table or
Heat Wave) in position on
the work platform.
2. Adjust the position of the
Tube with its angled end
aligned next to and facing
the PCB.
3. Position the height of the
Tube slightly above the
PCB by adjusting the height
of the Hose Connector.
4. Reposition the Tube as
necessary during rework
operations to provide
optimal fume extraction.
Содержание TF 500
Страница 1: ...INSTALLATION ThermoFlo Accessories Installation Operation Instructions ...
Страница 3: ...i MANUAL NO 5050 0421 REV B ...
Страница 7: ...3 Work Platform ...
Страница 15: ...11 Standard Board Holder ...