
10
Standard Board Holder
Installation
This accessory (part number 6018-0098) is provided with each TF 500 ThermoFlo System. You can use this
accessory to hold your PCB (up to 20.3 cm X 20.3 cm (8" X 8") size) assemblies in position for rework. If you are
using a Heat Wave Preheating System, it is not necessary to assemble this accessory; use the board holder on the Heat
Wave.
Use the following instructions and accompanying illustrations as a guide to assemble the standard Board Holder.
1. Place the Base (item
´
) upside down on a work surface and install the 4 Rubber Feet (item
É
) using
the 4 Mounting Screws (item
11
).
2. Turn the Base over and position as shown.
3. Mount the Large Bracket (item
¬
) to the left side of the Base (item
°
) using 2 Mounting Screws (item
).
NOTE
There are mounting holes at 2 different heights on each of the supplied
brackets. Use the holes which provide the correct height for use with your
PCB assemblies.
4. Place the Long Holding Clamp (item
¯
) in position on the Large Bracket (item
¬
). Secure clamp in
position using a Locking Screw (item
®
) and Flat Washer (item
³
).
5. Install the Leveling Screw (item
²
) Adjust Leveling Screw until its end just touches the bottom of the
Long Holding Clamp (item
¯
).
6. Mount the Small Bracket (item
°
) to the right side of the Base (item
´
) using 2 Mounting Screws
(item
).
7. Place the Short Holding Clamp (item
±
) in position on the Small Bracket (item
°
). Secure the clamp
in position using the Locking Screw (item
®
) with Flat Washer (item
³
).
Operation
To install a PCB assembly, simply adjust the holding clamps as necessary, place the PCB in the “V” grooves on
the clamps and tighten the Locking Screws to secure in position.
Position the Board Holder with the component rework area directly beneath the ThermoFlo handpiece.
Move the PCB or Board Holder as necessary for proper component-to-nozzle alignment.
Содержание TF 500
Страница 1: ...INSTALLATION ThermoFlo Accessories Installation Operation Instructions ...
Страница 3: ...i MANUAL NO 5050 0421 REV B ...
Страница 7: ...3 Work Platform ...
Страница 15: ...11 Standard Board Holder ...