
14
Installation
This Kit (part number 6018-0105) allows the user to easily connect a 7.6mm (3 inch) fume extraction hose to the
Work Platform. Use the following instructions and accompanying illustrations as a guide to assemble the Fume
Extraction Ready Attachment.
1. Install the Hose Connector (item
¬
) onto the Support Arm as shown. Install the Height Locking Knob
(item
®
, the shortest of the 2 knobs supplied) through the slot in the Hose Connector and into either of
the 2 mounting holes in the Support Arm (see Rear View on illustration). Tighten the Height Locking
Knob(item
®
) to secure the Hose Connector in position.
NOTE
The 2 mounting holes offer the user a wide range of height adjustment. For
lower height adjustments, use the lower mounting hole; for greater height
requirements, use the upper mounting hole.
Fume Extraction Ready Attachment
Содержание TF 500
Страница 1: ...INSTALLATION ThermoFlo Accessories Installation Operation Instructions ...
Страница 3: ...i MANUAL NO 5050 0421 REV B ...
Страница 7: ...3 Work Platform ...
Страница 15: ...11 Standard Board Holder ...