61
DANGER
POTENTIAL SHOCK HAZARD
The following steps are to be
performed by
qualified service
personnel only
. Removal of the
rear panel exposes line voltage
parts. Service personnel must
insure that AC power cord is dis-
connected when installing jumper
wire (step #5) and disconnecting
jumper wire (step #9).
2. Remove the 12 screws securing the Rear Panel to the
system chassis.
3. Lay the Rear Panel on the work surface exposing the
inside of the system.
4. Locate the 2 Pin Header inside the power source
chassis near the rear and center.
5. Place a jumper wire across the pins.
6. Install the AC power cord. Place the
POWER
Switch
in the ON (“1”) position. The system is now in
Calibration ("CAL") Mode.
7. Press the
TIP OFFSET
Key to exit Calibration ("CAL")
Mode. After a few seconds, any password will be
removed.
8. Place the
POWER
Switch in the OFF (“0”) position.
Disconnect the AC power cord.
9. Remove the jumper wire.
10. Replace the rear panel cover using the screws removed
in step #2. Install the AC power cord.
Figure 73. Rear Panel Removal
Figure 74. 2 Pin Header
Figure 75. Power Off
Содержание PRC 2000
Страница 1: ...1 SYSTEM OPERATION MAINTENANCE MANUAL PRC 2000 SYSTEMS ...
Страница 2: ...2 ...
Страница 3: ...3 MANUAL NO 5050 0313 REV G ...
Страница 17: ...17 Figure 6 Thermal Management Center ...
Страница 23: ...23 Figure 12 Pik And Paste Section ...
Страница 74: ...74 ...
Страница 95: ...95 Figure 122 Pulse Plate Set Up ...
Страница 96: ...96 ...
Страница 102: ...102 ...
Страница 111: ...111 ...
Страница 119: ...119 ...