Section 5 Mechanical PCM Pump Control
Typical Installation Overview with PCM Pump Control
5.1 Power Conduit Installation
Install conduit that runs from the main circuit breaker panel to the PV100
®
. This conduit will contain the
contain the Line, Neutral and Ground wires for the PV100
®
. This conduit can also contain pump power wires.
The power conduits must be stubbed from the seal-off to the bottom of the pedestal conduit plate.
Wires
Wire Requirements
Power (Hot, Neutral,
Ground)
Three 93) wires (black, white, green) 600 V-Rated, Minimum #14-AWG- Oil &
Gas Resistant, Wet Locations
Doc. No.: M1900 Rev.: 8
Page 22 of 65