Conduit Sealing
3.1.2 Pedestal Conduits
All conduits in the PV100
®
pedestal should terminate at the conduit plate. A seal-off must be installed in
these conduit runs. Install ½-inch or ¾-inch rigid steel conduits as applicable.
IMPORTANT:
Any unused knockout holes that have been removed must be sealed in order
to meet NEC code.
3.1.3 Grounding
ThePV100
®
incorporates internal noise suppression circuitry. To ensure safety and proper operation of the
equipment, all devices of the OPW system must be grounded.
A ground wire (preferably
Green
) must be connected between the device’s ground terminal and the main
electrical service panel. One earth ground connection is required per OPW device.
CAUTION:
Do not rely on the conduit to provide ground connections.
Doc. No.: M1900 Rev.: 8
Page 17 of 65
Содержание M1900
Страница 48: ...Program a Carded System Doc No M1900 Rev 8 Page 48 of 65...
Страница 56: ...Appendix A PV100 Primary Board PV100 Primary Board Doc No M1900 Rev 8 Page 56 of 65...
Страница 65: ......