Chapter 5: Payload Structures
383
(15.1)
CG
188.7
(7.43)
CG
16.5 (0.65)
Units are mm (inches)
Wheel
Axis
699 (27.5)
345.3 (13.59)
Figure 5-3. Center of Gravity of Platform
The following figures show the calculations of safe placements for the center of gravity for pay-
load structures with the weights listed. The center of gravity, in each instance, needs to be
within the area shown. All units are mm.
NOTE:
These figures show the limits of where the payload structure center of grav-
ity can be placed. You should try to keep your CG as close to the center of these fig-
ures as possible.
In the following three figures, light blue represents the payload structure, while dark blue rep-
resents the platform.
11970-000 Rev H1
LD Platform OEM User's Guide
55
Содержание LD Platform
Страница 1: ...I611 E 02 LD Platform User s Guide...
Страница 8: ......
Страница 37: ...Chapter 3 Setup Figure 3 15 E Stop Jumper on LD Platform Core 11970 000 Rev H1 LD Platform OEM User s Guide 37...
Страница 44: ......
Страница 70: ...70 LD Platform OEM User s Guide 11970 000 Rev H1 6 2 Payload Bay Connections Figure 6 7 E Stop Chain Diagram...
Страница 98: ......
Страница 130: ......
Страница 139: ......