55
Downloading Data
Section 7-3
2.
Click the
OK
Button.
If the communications between the Position Control Unit and Servo Drive
are established at this point, the following dialog box will be displayed to
confirm whether to release the connection or not.
3.
Click the
OK
Button to release the connection and start downloading Unit
Parameters to the Position Control Unit.
Clicking the
Cancel
Button will cancel downloading, however, the param-
eters that were downloaded before the cancellation should be downloaded
to the Position Control Unit.
4.
If the checkbox for writing to flash memory was selected a few steps be-
fore, the following dialog box will be displayed to confirm that the Position
Control Unit will be restarted to enable the registered axis map after com-
pletion of the download.
5.
Click the
OK
Button to restart the Position Control Unit.
6.
If the connection was released in step 2, the connection status can be re-
stored (established in this case) here. To establish the connection, click the
OK
Button. Otherwise, click the
Cancel
Button.
7.
When the Download to NC Unit Dialog Box is closed, the download will be
completed.
Содержание CX-MOTION-NCF - V1.9
Страница 1: ...Cat No W436 E1 09 CX Motion NCF Ver 1 9 SYSMAC CXONE AL_C V3 CXONE AL_D V3 OPERATION MANUAL...
Страница 2: ......
Страница 3: ...CXONE AL C V3 CXONE AL D V3 CX Motion NCF Ver 1 9 Operation Manual Revised September 2009...
Страница 4: ...iv...
Страница 6: ...vi...
Страница 20: ...xx...
Страница 24: ...xxiv Application Precautions 5...
Страница 36: ...12 Connecting to PLC Section 2 2...
Страница 39: ...15 Screen Name Section 3 1 Edit Parameter Windows Edit Unit Parameters Window Edit Servo Parameters Window...
Страница 40: ...16 Screen Name Section 3 1 Monitor Windows Axis Monitor Window Unit Monitor Window...
Страница 66: ...42 Editing Servo Parameters Section 5 2...
Страница 71: ...47 Print Section 6 5 Print Samples An example of printed Unit Parameters is shown below...
Страница 92: ...68 Writing to Flash Memory Section 7 6...
Страница 98: ...74 Axis Monitor Section 8 2 2 Click the OK Button to start communications i e establish connection...
Страница 106: ...82 Axis Monitor Section 8 2...
Страница 107: ...83 SECTION 9 Test Run Operation This section describes the test run operations for each axis 9 1 Test Run 84...
Страница 112: ...88 Test Run Section 9 1...
Страница 138: ...114 Troubleshooting Section 11 3...
Страница 142: ...118 Index...
Страница 146: ...122 Revision History...