75
Power Transformers
To check the winding insulation completely, it is necessary to measure the
capacitance and the DF of all insulation gaps (in this case six capacitors).
In IEEE Std. 62-1995 [3.4] the test procedure is described for transformers with
two and three windings. Figure 6-4 shows the six measurements.
Figure 6-4
Three-winding transformer test according to IEEE 62-1995
T
Tertiary winding
C T
Cap. T to Ground
C H-T Cap. H to
T
Caution:
All phases and the neutral terminal of one winding (H, L and T) have
to be short-circuited. Due to the inductance of the windings resonant effects
may occur and influence the measurement.
Test Mode
Energize
Ground
Guard
UST
Measure
GST
HIGH
–
LOW, TERT.
–
C
H
GST
LOW
–
TERT., HIGH
–
C
L
GST
TERT.
–
HIGH, LOW
–
C
T
Supplementary test for interwinding insulations
TERT.
LOW
HIGH
C
HT
C
LT
C
HL
C
T
C
L
C
H
Содержание CP TD1
Страница 1: ...CP TD1 Reference Manual...
Страница 14: ...CP TD1 Reference Manual V 1 44 14...
Страница 20: ...CP TD1 Reference Manual V 1 44 20...
Страница 32: ...CP TD1 Reference Manual V 1 44 32...
Страница 38: ...CP TD1 Reference Manual V 1 44 38...
Страница 84: ...CP TD1 Reference Manual V 1 44 84 Figure 6 14 Frequency scan for H L f 5 kV...
Страница 114: ...CP TD1 Reference Manual V 1 44 114...
Страница 128: ...CP TD1 Reference Manual V 1 44 128...
Страница 154: ...CP TD1 Reference Manual V 1 44 154 Figure 12 12 Diverter switch for 110 kV 40 MVA...
Страница 184: ...CP TD1 Reference Manual V 1 44 184...
Страница 186: ...CP TD1 Reference Manual V 1 44 186...