Operation
21
2
Operation
2.1
Measurement Setup
2.1.1
Setup of Devices with Trolley
The equipment trolley holds the
CPC 100
,
CP TD1
and all required cables. The
trolley is equipped with a grounding bar with three knurled screws to ensure a
solid connection to the grounding terminals of all devices.
2.1.2
Setup of Devices without Trolley
If the
CPC 100
and
CP TD1
are to be operated without trolley, place them on
their transport cases and connect them with the long type data cable
CPC 100
⇔
CP TD1
(3m) and the long-type booster cable
CPC 100
⇔
CP TD1
(3m). Each device has to be grounded separately with a 6m grounding cable of
at least 6mm
2
.
Содержание CP TD1
Страница 1: ...CP TD1 Reference Manual...
Страница 14: ...CP TD1 Reference Manual V 1 44 14...
Страница 20: ...CP TD1 Reference Manual V 1 44 20...
Страница 32: ...CP TD1 Reference Manual V 1 44 32...
Страница 38: ...CP TD1 Reference Manual V 1 44 38...
Страница 84: ...CP TD1 Reference Manual V 1 44 84 Figure 6 14 Frequency scan for H L f 5 kV...
Страница 114: ...CP TD1 Reference Manual V 1 44 114...
Страница 128: ...CP TD1 Reference Manual V 1 44 128...
Страница 154: ...CP TD1 Reference Manual V 1 44 154 Figure 12 12 Diverter switch for 110 kV 40 MVA...
Страница 184: ...CP TD1 Reference Manual V 1 44 184...
Страница 186: ...CP TD1 Reference Manual V 1 44 186...