9
3.2
Work modes
The BRE-I-5K Series hybrid inverter has the following work modes based on your
configuration and layout conditions
Work mode: Self-use
Priority: load>battery>grid
1. Generated
solar
energy
2. Storage
in
Battery
3. Load
consumption
4. Grid
supply
power
Self-consumption of PV renewable energy is the highest priority. The PV excess is
used to charge the batteries, then fed back into the grid.
Work mode: Feed in Priority
Priority: load>grid>battery
This mode applies the area that has high feed-in tariff and export control.
The PV generated power will be used to supply the loads firstly, then feed into the
grid. The excess power will charge the battery
Содержание BRE-I-5K
Страница 1: ...1 User Manual BRE I 5K OLIPOWER ENERGY AUTOMATION TECHNOLOGY...
Страница 28: ...28 1 ADD Interface ADD interface PINS definition...
Страница 33: ...33...
Страница 34: ...34...
Страница 51: ...51 6 3 5 System Switch Press up or down button to turn on or turn off the inverter Press OK to confirm...
Страница 54: ...54 Reactive power setting After user log into the system Remote control Reactive power...
Страница 55: ...55 Volt watt setting After user log into the system Remote control Australia...
Страница 62: ...62...