![OLiPower BRE-I-5K Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/olipower/bre-i-5k/bre-i-5k_user-manual_4507674022.webp)
22
electrical wiring connection.
Figure 5-5
The main steps to connect the BRE-I-5K system
·
PV string connection
·
AC output connection
·
Battery connection
·
Battery power connection
·
Battery communication connection
·
EPS connection
·
Earth connection
·
Communication connection
5.7.1
PV Wiring Connection
Before connecting PV strings to BRE-I-5K hybrid inverter, please make sure
requirements are followed as below:
·
The total short- circuit current of PV string must not exceed inverter's max DC
current. Make sure open circuit voltage of PV string is less than 600V.
·
PV strings could not connect to earth/grounding conductor
NOTICE!
Inverters have not been tested to AS/NZS 4777.2:2020 for multiple
phase combinations
NOTICE
Содержание BRE-I-5K
Страница 1: ...1 User Manual BRE I 5K OLIPOWER ENERGY AUTOMATION TECHNOLOGY...
Страница 28: ...28 1 ADD Interface ADD interface PINS definition...
Страница 33: ...33...
Страница 34: ...34...
Страница 51: ...51 6 3 5 System Switch Press up or down button to turn on or turn off the inverter Press OK to confirm...
Страница 54: ...54 Reactive power setting After user log into the system Remote control Reactive power...
Страница 55: ...55 Volt watt setting After user log into the system Remote control Australia...
Страница 62: ...62...