![OLiPower BRE-I-5K Скачать руководство пользователя страница 47](http://html1.mh-extra.com/html/olipower/bre-i-5k/bre-i-5k_user-manual_4507674047.webp)
47
42
Brazil-W
Brazil power Grid, meet Grid standards “NBT 16150”.
43
EN50549-PL-W
Poland power Grid.
44
Brazil-180s-W
Brazil power Grid, meet Grid standards “NBT 16150”.
45
UNE217002-ES
Spain power Grid.
46
G98-NI
G98 for Northern Ireland
47
G99-NI
G99 for Northern Ireland
48
EN50549-NW
Norway-400VLine
49
EN50549-NW-LV
Norway-230VLine-R3-10-15K-LV only,others reserved
50
IEC61727-LV
133V 50Hz, low voltage power grid
51
Australia B
For small interconnected power systems.
e.g., Western Power
52
Australia C
For isolated or remote power systems.
e.g., Horizon Power and Tas Networks
g) Grid
Normally, the end user does not need to set the grid parameters, all default value has set
on factory according to safety standards of different countries.
If need to reset, please refer to the requirement of local grid to do changes.
Press up or down button to change the value of grid voltage and grid frequency protect.
Press 'Ok' to confirm.
Содержание BRE-I-5K
Страница 1: ...1 User Manual BRE I 5K OLIPOWER ENERGY AUTOMATION TECHNOLOGY...
Страница 28: ...28 1 ADD Interface ADD interface PINS definition...
Страница 33: ...33...
Страница 34: ...34...
Страница 51: ...51 6 3 5 System Switch Press up or down button to turn on or turn off the inverter Press OK to confirm...
Страница 54: ...54 Reactive power setting After user log into the system Remote control Reactive power...
Страница 55: ...55 Volt watt setting After user log into the system Remote control Australia...
Страница 62: ...62...