![OLiPower BRE-I-5K Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/olipower/bre-i-5k/bre-i-5k_user-manual_4507674011.webp)
11
1. Generated
solar
energy
2. Load
consumption
3. Self-use
from
battery
4. Grid
supply
power
when the battery capacity is
not enough
This mode applies the area that has electricity price between peak and valley. User
can use of-peak electricity to charge the battery.
The charging and discharging time can be set flexibly, and it also allows choosing
whether charge from the grid or not.
Work mode: Back up mode
Priority: battery>load>grid
1. Generated solar
energy
2. Storage in Battery
3. Load consumption
4. Grid supply power
Содержание BRE-I-5K
Страница 1: ...1 User Manual BRE I 5K OLIPOWER ENERGY AUTOMATION TECHNOLOGY...
Страница 28: ...28 1 ADD Interface ADD interface PINS definition...
Страница 33: ...33...
Страница 34: ...34...
Страница 51: ...51 6 3 5 System Switch Press up or down button to turn on or turn off the inverter Press OK to confirm...
Страница 54: ...54 Reactive power setting After user log into the system Remote control Reactive power...
Страница 55: ...55 Volt watt setting After user log into the system Remote control Australia...
Страница 62: ...62...