![OLiPower BRE-I-5K Скачать руководство пользователя страница 48](http://html1.mh-extra.com/html/olipower/bre-i-5k/bre-i-5k_user-manual_4507674048.webp)
48
h) Export
control
With this function the inverter can control the energy export to the grid. Press up or down
button to change the export power.
Press “OK” to confirm
i) Battery
NOTICE
Hard export limit control and soft export limit control be set together
For more settings, see 6.4 (Export Control (Advanced))
Содержание BRE-I-5K
Страница 1: ...1 User Manual BRE I 5K OLIPOWER ENERGY AUTOMATION TECHNOLOGY...
Страница 28: ...28 1 ADD Interface ADD interface PINS definition...
Страница 33: ...33...
Страница 34: ...34...
Страница 51: ...51 6 3 5 System Switch Press up or down button to turn on or turn off the inverter Press OK to confirm...
Страница 54: ...54 Reactive power setting After user log into the system Remote control Reactive power...
Страница 55: ...55 Volt watt setting After user log into the system Remote control Australia...
Страница 62: ...62...