
OEC 9800 Periodic Maintenance Procedure
18
RED INDEX MARK
ABOVE PIN 12
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
J1
Figure 3. J1 Interconnect Cable Pin-out
3.
Connect the Interconnect Cable to the C-Arm and verify continuity between the following:
From
To
Spec
C-Arm Second Earth Ground (Bottom
left beneath Front Leg Cover)
AC Power Plug Ground
Pin
< 0.5
Ω
Workstation Equipotentiality Stud
(Underneath the bottom right side)
AC Power Plug Ground
Pin
< 0.5
Ω
4.
Record only the highest resistance on the PM form.