NSC Sicherheitstechnik GmbH
38/47
2011 / 04 / 26
Eckendorfer Str. 125 c
Installation Manual Solution F2 20110509.doc
33609 Bielefeld
Version S031A01.01
5. Mounting instruction
1. First please remove the cover of the FCP. You will find the key on the backside of the panel
housing.
2. In the FCP Solution F2 package you will find a drilling template for easier mounting. Please use
this template for drilling the holes.
.
3. Please use 8mm dowels for fixing the screws. Start with the upper screws.
4. Please open the cover of the FCP. Don’t put the batteries into the panel yet. Hang the FCP on
the upper screws and then fix the screws of the lower holes.
5. The control panel can be opened by unscrewing the inner metal, lift up the panel a bit and turn it
down then. Hereafter you get free access to the terminals for connecting the wires.
6. Don’t connect the panel to Mains AC yet. Use the wiring diagrams for connecting loops,
conventional zones and sounders / strobes.
7. If you are connecting the shielding of the loop wires (the FCP „Solution F1“ does NOT need that
in any case but it can be advantageous to do so) then you have to connect the wire on both sides
at the loop card.
8. Please connect peripheral components like LCD repeater panels, remote control panels etc.
9. Now you have to connect the Mains AC cable. Make sure that the Mains AC fuse on the power
supply is plugged in.
10. Switch on Mains AC voltage.
11. If the internal buzzer sounds, please switch of by using push button
.
12. Put the batteries on the bottom of the panel housing and fix them by using the cable fixer.
Connect the batteries to the power supply by using the supplied cables (see wiring diagram).
13. Please follow the commissioning instruction.