OnTime Clock
Installation and User Guide
Firmware Version 1
All claims based on information publicly available at time of printing. All other product or service names mentioned
in this document may be trademarks of the companies with which they are associated.
© 2015 Novanex, Inc. | All rights reserved | page 8
7.
Position the keyhole slot located on the rear of the clock over the fastener head.
8.
Pull the clock slightly downward until the unit is seated securely.
4.5. Mounting the Double Sided Analog Clock
1.
Determine mounting location. There should be a solid stud or post for mounting
the junction box and to hold the weight of the double sided clock.
2.
Cut a 4
1
/
8
”x 4” (104.7mm x 101.6mm) hole in the drywall. (See
Figure 3.)
Figure 3: Analog Clock Cutout Template
3.
Mount the junction box (item 1 in Figure 4) to the stud or post in accordance with
local regulations.