![Northern Telecom NAC Скачать руководство пользователя страница 316](http://html.mh-extra.com/html/northern-telecom/nac/nac_user-manual_1708628316.webp)
Page grid
16-8 Schedule Definition
P0724352 Standard 1.0 November 1994
•
Undo changes to schedule definition
Removes all changes made to the schedule definition currently on
display, providing they were not saved.
•
Save as a new schedule definition
Saves the information as a new schedule definition.
•
Overwrite an existing schedule definition
Replaces an existing schedule definition with the schedule definition
currently on display.
•
Delete an existing schedule definition
Removes the schedule definition from the system.
•
Attach change orders to this schedule
Attaches change orders to this schedule.
•
Return to main schedule screen
Returns the system to the main Schedule Definition screen.
PF1=Select no command
Removes the Commands pop-up window from the screen.
PF2=Options
Displays a description or list of valid entries for the field.
PF2=Remove options pop-up
Removes the Options pop-up window from the screen.
F6=Add multiple reports
Allows more than one report to be added to the schedule at one time.
F6=Stop adding
Indicates that no more reports are to be added to the schedule, at this time.
This function key appears after [Add multiple reports] is selected.
Remove=Remove report
Removes a report from the schedule.