5-40 Maintenance-level activities
Uninstalling the terminal
Use the following procedure to uninstall terminals when you
need to replace the control PCP, the firmware, the validator
or the escrow.
This procedure ensures that terminal records are uploaded
to the Millennium Manager. Otherwise, replacing these
components would result in the loss of the records.
1
.
Put the terminal out of service, as described in
Putting
the terminal out of service,
in this chapter.
2.
Download the CDRs. Refer to
Sending CDRs to the
Millennium Manager
in this chapter.
Collection messages are stored in the memory of the
control PCP in the terminal. If the collection message
is not received by the Millennium Manager, it is
stored with the CDRs and downloaded with them.
If no CDRs are present, the craftsperson must
generate a CDR, then download the CDR to the
Millennium Manager. If the CDRs are not received by
the Millennium Manager, an error message is
produced.
Use the error codes chart in Appendix B to trouble
shoot any problems which arise.
3. Close and lock the terminal.
4. Access the craft interface again.
5. Press # on the keypad. The terminal is now uninstalled.
6.
Do whatever maintenance procedures required. These
procedures are described in Chapter 7.
When you are finished, close and lock the terminal,
this message
Not
installed
appears
on the VFD:
Use
# to INSTALL
NTP: 506-6501-203 Issue: 00.01 Status: Standard Date: January 1997
Содержание Millennium multi-pay M1211
Страница 3: ...iv NTP 506 6501 203 Document issue 00 01 Status Standard Date January 1997...
Страница 17: ...xviii Table of contents NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Страница 21: ...t ATG 4 About this guide I NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Страница 57: ...1 36 Describing the terminal NTP 506 6501 203 Document issue 00 01 Status Standard Date January 1997...
Страница 87: ...2 30 Mounting the terminal NTP 506 6501 203 Document issue 00 01 Status Standard Date January 1997...
Страница 167: ...Troubleshooting strategies 6 13 Millennium multi pay terminal installation operation and maintenance guide...
Страница 168: ...i 6 14 Troubleshooting strategies NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Страница 268: ...7 92 Installing replaceable parts NTP 506 6501 203 Document issue 00 01 Status Standard Date January 1997...
Страница 281: ...Customer orderable parts 9 9 Millennium multi pay terminal installation operation and maintenance guide...
Страница 282: ...9 10 Customer orderable parts NTP 506 6501 203 Document issue 00 01 Status Standard Date January 1997...
Страница 283: ...Customer orderable parts 9 11 Figure 9 4 Auxiliary view multi pay terminal chassis...
Страница 304: ...A 16 Appendix A List of alarms NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Страница 324: ...C 10 Appendix C Regulatory notices NTP 506 6501 203 Issue 00 01 Status Standard Date January 1997...
Страница 349: ......