DPNSS/DASS startup and status check
133
DPNSS/DASS startup and status check
Use
Procedure 54 “DPNSS/DASS and DCHI (IDA) startup” (page 133)
to
take DPNSS/DASS and DCHI from a disabled state to an operational
state.
Procedure 54
DPNSS/DASS and DCHI (IDA) startup
Step
Action
1
Check the status of all DPNSS/DASS cards.
In
Figure 37 "IDA startup" (page 133)
, the PRI shown is disabled.
(For DCH, the red ENB/DIS LED is lit.)
Figure 37
IDA startup
2
To enable the PRI, enter:
LD 75
ENL DDCS loop
The response is:
OK
3
To enable the DCHI (NTAK93AB), enter:
LD 75
ENL DDSL n
The response is:
OK
STAT DDSL n
The response is:
ENBL IDLE
(DCHI is enabled, but all channels are disabled.)
4
To enable the LAP protocols for each real and virtual channel
configured on the DPNSS1/DASS2 link, enter:
LD 75
Nortel Communication Server 1000
Media Gateway 1000E PRI Gateway Installation and Commissioning
NN43041-311 04.01
4 June 2010
Copyright © 2007-2010 Nortel Networks. All Rights Reserved.
.