4-18
Power-Up
and
Testing
To check Conveyor upstream and downstream SMEMA communication:
1.
Perform a Service Shutdown as specified in the
2.
Attach the TS-01 upstream and downstream cable adapters to the TS-01 I/O Test Box.
3.
Attach the TS-01 upstream and downstream cables to the appropriate SMEMA connectors at
the rear of the dispensing system (Figure 4-12).
Figure 4-12 SMEMA Connections
4.
Make sure that all of the
I
↔
O/INDEP
switches along the edge of the TS-01 I/O Test Box are
all set to
INDEP
.
5.
Start the dispensing system as described in
4.5 Powering on the Dispensing System
6.
Make sure that the
DRIVERS/OPTO I/O
switch in the corner of the TS-01 I/O Test Box is set
to
OPTO I/O
.
7.
In the FmXP Main Window, click on
Configuration
and then select
Setup Conveyors
.
8.
Click on
I/O Test
and then on the Outputs 0-31 tab (Figure 4-13).
9.
Locate the upstream and downstream bits. Perform the actions specified in Table 4-1.
Содержание Asymtek Spectrum S-920
Страница 1: ...Spectrum Series S 920 Dispensing System Installation Operations Maintenance Manual P N 7212417 Rev A...
Страница 2: ......
Страница 4: ......
Страница 30: ...1 14 Introduction 1 10 5 Rear View Figure 1 7A Rear View 2 3 4 1 5...
Страница 124: ......
Страница 172: ...7 12 Maintenance Figure 7 7 Lubricating the X Axis Linear Guides Figure 7 8 Lubricating Y Axis Linear Guides...
Страница 185: ...Troubleshooting 8 11 Figure 8 3 FmXP Scale Setup Menu Figure 8 4 Scale Error Message...
Страница 190: ......
Страница 204: ......
Страница 208: ......
Страница 210: ......
Страница 220: ......
Страница 222: ......
Страница 223: ......
Страница 224: ......
Страница 225: ......
Страница 226: ......
Страница 234: ......