Power-Up and Testing
4-19
Table 4-1 SMEMA Communication Test Matrix
Action
Result
In dialog box, press
Request Board
from Upstream Tool
output button.
No. 2 LED on TS-01 comes ON.
Press TS-01 button No.
3
.
Dialog box “Board Available from
Upstream Tool” input changes to ON.
In dialog box,
press Board Available
to Downstream
output button.
No. 4 LED on TS-01 comes ON.
Press TS-01 button No.
5
.
Dialog box “Downstream Tool
Requests Board” input changes to
ON.
Figure 4-13 Conveyor I/O (Outputs 0-31)
10.
If results are not as specified, check all TS-01 connections and retest. If results are still
negative, refer to
Содержание Asymtek Spectrum S-920
Страница 1: ...Spectrum Series S 920 Dispensing System Installation Operations Maintenance Manual P N 7212417 Rev A...
Страница 2: ......
Страница 4: ......
Страница 30: ...1 14 Introduction 1 10 5 Rear View Figure 1 7A Rear View 2 3 4 1 5...
Страница 124: ......
Страница 172: ...7 12 Maintenance Figure 7 7 Lubricating the X Axis Linear Guides Figure 7 8 Lubricating Y Axis Linear Guides...
Страница 185: ...Troubleshooting 8 11 Figure 8 3 FmXP Scale Setup Menu Figure 8 4 Scale Error Message...
Страница 190: ......
Страница 204: ......
Страница 208: ......
Страница 210: ......
Страница 220: ......
Страница 222: ......
Страница 223: ......
Страница 224: ......
Страница 225: ......
Страница 226: ......
Страница 234: ......