
6-20
Operation
To setup the heater tooling in Fluidmove:
WARNING!
The heater may be hot. Avoid touching heater surfaces or burn injury may occur.
1.
In the Fluidmove Main Window, click on
Run a Program
.
2.
In the Production Window (Figure 6-15), click on
Setup
and in the list box select
Setup
Heater 2
.
!
The Heater Control Window (Figure 6-16) will open.
Figure 6-15 Fluidmove Production Window
3.
In the Heater Control Window (Figure 6-16), locate the loop (channel) for the desired heater.
Содержание Asymtek Spectrum S-920
Страница 1: ...Spectrum Series S 920 Dispensing System Installation Operations Maintenance Manual P N 7212417 Rev A...
Страница 2: ......
Страница 4: ......
Страница 30: ...1 14 Introduction 1 10 5 Rear View Figure 1 7A Rear View 2 3 4 1 5...
Страница 124: ......
Страница 172: ...7 12 Maintenance Figure 7 7 Lubricating the X Axis Linear Guides Figure 7 8 Lubricating Y Axis Linear Guides...
Страница 185: ...Troubleshooting 8 11 Figure 8 3 FmXP Scale Setup Menu Figure 8 4 Scale Error Message...
Страница 190: ......
Страница 204: ......
Страница 208: ......
Страница 210: ......
Страница 220: ......
Страница 222: ......
Страница 223: ......
Страница 224: ......
Страница 225: ......
Страница 226: ......
Страница 234: ......