24
4.8 C
OMPLETING THE
I
NSTALLATION
1.
Start up your sprayer and test the sprayer’s
functionality. The NORAC Control Panel
does not need to be powered up for the
original switches to function. Unfold the
booms and raise/lower each boom and main
section.
Confirm that the cabling/hoses are
agreeable to the entire range of
motion.
2.
If any functions do not work, review the
hydraulic and electrical portions of this
manual to check for proper installation. If
you still have trouble, contact NORAC for
assistance.
3.
Turn on the power for the UC4+ Control
Panel using the switch on the side of its
chassis.
4.
Repeat the Boom Speed Test as described in
Section
4.2
Boom Speed Test
with the
NORAC UC4+ Spray Height Control system
installed. Record the results for comparison
in
Table 5.
5.
The procedure for the installation of the
UC4+ Spray Height Control system is now
complete.
Begin
the
AUTOMATIC
SYSTEM SETUP procedure as described in
the
UC4+
Spray
Height
Control
Operator’s Manual
(
M01
).
Содержание UC4+ Raptor Pro 1200
Страница 10: ...7 Figure 3 Hydraulic Components ...
Страница 15: ...12 Figure 9 Sensor Serial Number Installation Location 3 SENSOR SYSTEM 5 SENSOR SYSTEM ...
Страница 29: ...26 5 3 ITEM C02B 44664 CABLE UC4 CAN NODE DUAL 5 4 ITEM C03 44656D CABLE VALVE VARIABLE RATE DT ...
Страница 30: ...27 5 5 ITEM C04 44651 VALVE EXTENSION CABLE 5 6 ITEM C10 44650 33 POWER CABLE UC3 BOOM RP1 ...
Страница 31: ...28 5 7 ITEM C12 44658 11 BC RP1 VALVE CABLE ...