19
Figure 20 – Valve Mounting Location
Figure 21 – Valve Mounting Example
4.6.3 Hydraulic Plumbing
WARNING!
From this point in the installation the booms
will be inoperative until the electronics are
fully installed.
1.
After the NORAC valves are mounted, the
hydraulic hoses and fittings can be plumbed.
The plumbing for the hydraulic circuit is
shown schematically in
Figure 3
.
2.
Connect the NORAC supplied hoses (
H02
)
to the Pressure (P) and Tank (T) ports on the
NORAC valve block (
V01
). Route both of
these lines to the sprayer valve block.
3.
Tee in these hoses (P and T lines) to the ports
on the sprayer valve block with
F03
.
4.
The existing hoses that run to the boom tilt
cylinders should be disconnected from the
sprayer valve block and reconnected to the
NORAC valve block.
a)
The “raise” lines from the side of the
cylinders, which raise the booms, must
be connected to the “B” ports of the
NORAC valve block.
b)
The “A” ports on the sprayer block must
then be plugged/capped with
F02
.
Содержание UC4+ Raptor Pro 1200
Страница 10: ...7 Figure 3 Hydraulic Components ...
Страница 15: ...12 Figure 9 Sensor Serial Number Installation Location 3 SENSOR SYSTEM 5 SENSOR SYSTEM ...
Страница 29: ...26 5 3 ITEM C02B 44664 CABLE UC4 CAN NODE DUAL 5 4 ITEM C03 44656D CABLE VALVE VARIABLE RATE DT ...
Страница 30: ...27 5 5 ITEM C04 44651 VALVE EXTENSION CABLE 5 6 ITEM C10 44650 33 POWER CABLE UC3 BOOM RP1 ...
Страница 31: ...28 5 7 ITEM C12 44658 11 BC RP1 VALVE CABLE ...