Squeegee System
95
Service Manual – SC450
Removal and Installation
Squeegee Spring Disassembly/Assembly
Disassembly
1
Drive the machine to the appointed disposal area, and empty the recovery tank and the solution tank.
2 Check that the control panel switches are turned to “0” Disconnect the battery connector (red)
3 Remove the recovery tank
4 Remove the batteries
5 Remove the squeegee (as shown in Squeegee Cleaning paragraph)
6 Remove the brush (as shown in Brush Cleaning paragraph)
7
With the help of an assistant, place the machine on a hoisting system (A) (or on a floor with a suitable
step), overturned as shown in the figure; lay the machine front and central side (B) on the hoisting
system (A) and let the rear side (C) free
8 Remove the screw with the nut (D) and release the squeegee lifting cable (E)
C
E
D
B
E
A
P200039