BI-PARTING GATE SETUP
1. Install the primary and secondary operators.
2. Set up external entrapment sensors, vehicle
detectors, and other input devices on both
operators before you connect the operators.
3. Test cycle the operators independently to make
sure there are no problems with gate travel and
open/close stops.
4. Install a twisted shielded pairs wire harness
between the two operators. Match A-A, B-B, and
COM-COM. Install the grounding shield on only
one of the controller mounting brackets.
5. Set one operator as the primary and the other as
the secondary.
6. Test the gate operation.
7.
Adjust LEAF DELAY CLOSE and LEAF DELAY
OPEN if required.
Figure 29. Dual Gate Connection
Wind Load Factors
Design gate panels to
minimize wind loads.
Earth Ground
Place the WARNING
signs on both sides of the gate.
Take a photograph of the
complete installation site.
WARNING
In-ground vehicle loop detectors
Edge Sensor
Keypad or Card Reader
Mount access control devices
at least 6 ft (1.8 m) beyond gate.
Photo Eye
Dual Gate
Communication
Wire
For Sequenced Gate applications refer to Advanced
Manual.
OPERATOR
COMMUNICATIONS
DUAL GATE
0 (OFF)
1 (SECONDARY)
2 (PRIMARY)
SEQUENCED GATE
0 (OFF)
1 SALLY A
2 SALLY B
3 LOOP VIEW #1
4 LOOP VIEW #2
5 LOOP VIEW #3
6 LOOP VIEW #4
LEAF DELAY CLOSE
0 (0.0 SECS)
1 (0.5 SECS)
.
.
.
20 (10.0 SECS)
LEAF DELAY OPEN
0 (0.0 SECS)
1 (0.5 SECS)
.
.
.
20 (10.0 SECS)
†
†
†
= Indicates default