
20
www.hysecurity.com
SLIDESMART CNX 15 BASIC MANUAL
MX4779 REV. A ©2019
WIRING AND POWER
1. Make sure both the DC and AC power switches
are in the OFF position.
2. Connect the battery harness to the back right
hand corner of the drive module. (Figure 20)
3. Remove the junction box cover. (Figure 21)
4. Connect the incoming power supply wires to the
AC or DC (solar) terminal block inside the junction
box. Match the wire colors. (Figure 22)
5.
Organize all the wire connections and put the
cover onto the junction box.
Note: For 208V/230V or solar (24V) installations,
place the label (included in the ship with kit)
over the factory default 115V 1Ø label.
6. For solar installations, remove the power switch
mounting plate and disconnect the DC wires
from the power supply. Tape or wire nut the ends
separately to prevent shorts (Figure 23).
Note: CNX operators require 24VDC rated solar
panels with a maximum open circuit voltage
of 48VDC.
7.
Set both AC and DC power switches to ON
8. Software version will appear on LCD display and
then the Setup Menu.
Figure 20. Battery Harness to Drive Module
Figure 21. Junction Box Cover
Figure 22. 115VAC/230VAC and Solar DC Terminals
DANGER
Turn off AC power at the source (circuit breaker
panel) before accessing the wires in the CNX
junction box. Follow facility Lock Out/Tag Out
procedures.
G
L
N
L
G
N
L
G N
Blue
(-)
Red
(+)
Blue
(-)
Red
(+)
Connect service outlet lead wires to 115VAC only.
AC
SOLAR
Figure 23.
Disconnect DC Power Supply Wires
Figure 24.
Set Both Power Switches to ON