Newave_OPM_PV11_PV31 _GB_250805.doc Operation
Page 35
4.8 LOAD TRANSFER: FROM MAINTENANCE BYPASS TO INVERTER OPERATIONS
This procedure describes the sequence of operations to be done in order to restart the UPS and
restore ON-LINE mode (Load on Inverter).
ALL THE OPERATIONS IN THIS SECTION MUST BE PERFORMED BY
AUTHORISED ELECTRICIANS OR BY QUALIFIED INTERNAL PERSONNEL.
Situation of UPS-System before starting the Transfer Procedure to ON-LINE mode:
The load is supplied directly by Input Mains power and the UPS is OFF.
1. Close Input fuses FA1 and FA2.
2. Close battery fuses/breakers FA3.
3. Close output switch IA2
.
4. On the LCD’s: “LOAD OFF, SUPPLY FAILURE” will appear and the mimic panel will show:
LED Indicator
Colour
LINE 1
Green
LINE 2
OFF
BYPASS OFF
INVERTER OFF
BATTERY Flashing/Green
5. Press simultaneously both ON/OFF buttons on UPS-control panel.
Unit will start-up and after about 60 seconds the mimic panel will show:
LED Indicator
Colour
LINE 1
Green
LINE 2
Green
BYPASS Green
INVERTER RED
BATTERY Green
6. Make sure that the bypass LED is green, then open the Maintenance Bypass Switch IA1
(position OFF).
7. Using LDC panel, select the COMMANDS menu and choose command “LOAD TO
INVERTER”. This will transfer the LOAD to Inverter on the complete system. On LCD panel
“LOAD PROTECTED” will appear.
THE LOAD IS NOW SUPPLIED BY INVERTER POWER AND IS PROTECTED
!