- 66 -
www.New-Leader.com
(800) 363-1771
314732-AA-B
NL5258G5/NL5300G5
Header
Pre- and Post-Season Checklist
IMPORTANT!
Do not operate or work on machine without reading and understanding the operator’s
manual.
Before starting engine/before starting machine operation
Program rate controller and document settings
Hydraulic hoses are secured properly
All stop, tail, and turn lights function properly
Gearcase oil level is correct
Tire pressures are equal on each side of chassis
All guards and shields in place
Battery condition and connection
Spinner assy moves through full range of operation
Electrical connections are tight and secure
Spinner discs and
fi
ns installed properly
All fasteners are secure
Spinner discs and
fi
ns are in acceptable condition
Inverted “V” is secure and installed properly
Material Divider assembly is square and secure
Sensor(s) are functioning properly
Material Divider is clean of build-up
Lubricate all grease
fi
ttings
Feedgate assembly is level and clean of build-up
Hydraulic oil level and line connections are tight
Encoder installed and secured
Hydraulic
fi
lters are current
Spinner sensor adjusted to proper gap
Chain oiler tank is full and operates correctly
Start engine/Start and run to operational temperatures
Hydraulic
fi
ttings are tight and no leaks *
Conveyor control valve is operating correctly
All pressure transducers are operating correctly
Calibrate radar/ground speed input
Check operation of all alarms
Test maximum conveyor RPM’s
Hydraulic
fl
ow test: ____GPM @ operating engine RPM
Test right and left hand spinner speed; ensure difference is
less than 5 RPM (when at operating RPM)
Check main relief valve setting :_____ PSI
Stop operation/Turn off engine and engage parking brake
Visually check for leaks
All oil levels full
Check belt/chain tension and alignment
Perform Calibrations
Product density testing, crush strength, and SGN scale (See
Spread Pattern Calibration
section for instructions).
Catch tests of all products and at least 1 blend for conveyor calibration and document settings and product characteristics
Spread pattern tests of all products and at least 1 blend and document settings and product characteristics
End of Season
Empty unit of all material
Clean unit inside and out
Sand and touch-up paint as necessary
Check for leaks
Wash chain conveyor, lubricate thoroughly when dry
Lubricate all grease
fi
ttings
Check spinner discs and
fi
ns for wear
Ensure all fasteners are secure and properly toruqed
Содержание AGCO NL5258G5
Страница 6: ...Insert Current New Leader Warranty...
Страница 38: ...38 www New Leader com 800 363 1771 Notes This page is intentionally left blank 314732 AA B NL5258 5300G5 AGCO...
Страница 43: ...43 www New Leader com 800 363 1771 Notes This page is intentionally left blank NL5258 5300G5 AGCO 314732 AA B...
Страница 50: ...50 www New Leader com 800 363 1771 Notes This page is intentionally left blank 314732 AA B NL5258 5300G5 AGCO...
Страница 63: ...63 www New Leader com 800 363 1771 Notes This page is intentionally left blank NL5258G5 NL5300G5 314732 AA B...
Страница 72: ...72 www New Leader com 800 363 1771 Notes This page is intentionally left blank 314732 AA B NL5258G5 NL5300G5...
Страница 128: ...128 www New Leader com 800 363 1771 Notes This page is intentionally left blank 314732 AA B NL5258G5 NL5300G5...
Страница 134: ...134 www New Leader com 800 363 1771 Notes This page is intentionally left blank 314732 AA B NL5258G5 NL5300G5...