- 100 -
www.New-Leader.com
(800) 363-1771
314732-AA-B
NL5258G5/NL5300G5
Header
•
Using the control buttons
(Reset,
Run, Stop), run a catch test. If spreading product that
has already been tested, press
to continue. To
begin a test, press
. Conveyor will run.
•
Once controller dispenses speci
fi
c amount,
conveyor will stop. Press
to continue.
•
Weigh material dispensed and enter actual
weight of material dispensed. Press
to continue.
• It is recommended a minimum of three (3) tests be
done PER PRODUCT to ensure accuracy. Once
each test is done, press “Repeat Calibration” to
run a subsequent test. When
fi
nished, press
.
• The main Calibration screen will appear. To
calibrate with a known amount brought to a
fi
eld,
press
.
Note:
Field totals can be reset from Summary
Screen if needed.
Controller Operations
Содержание AGCO NL5258G5
Страница 6: ...Insert Current New Leader Warranty...
Страница 38: ...38 www New Leader com 800 363 1771 Notes This page is intentionally left blank 314732 AA B NL5258 5300G5 AGCO...
Страница 43: ...43 www New Leader com 800 363 1771 Notes This page is intentionally left blank NL5258 5300G5 AGCO 314732 AA B...
Страница 50: ...50 www New Leader com 800 363 1771 Notes This page is intentionally left blank 314732 AA B NL5258 5300G5 AGCO...
Страница 63: ...63 www New Leader com 800 363 1771 Notes This page is intentionally left blank NL5258G5 NL5300G5 314732 AA B...
Страница 72: ...72 www New Leader com 800 363 1771 Notes This page is intentionally left blank 314732 AA B NL5258G5 NL5300G5...
Страница 128: ...128 www New Leader com 800 363 1771 Notes This page is intentionally left blank 314732 AA B NL5258G5 NL5300G5...
Страница 134: ...134 www New Leader com 800 363 1771 Notes This page is intentionally left blank 314732 AA B NL5258G5 NL5300G5...