Chapter 5: User Tests
Multicast (IGMP) Test
129
Data Start
is the amount of time it took to receive the first data
byte after the analyzer sent the IGMP join message.
Data Transfer
is the amount of time it took to receive the data
from the target server.
Total Time
is the sum of data start and data transfer time. It is the
total test time from beginning to end.
Data Bytes
indicates the total number of data bytes transferred.
Rate
is the measured bit rate, based on frames sent and the
number of bytes received.
If a source address is specified a ping test runs simultaneously
with the IGMP V3 test. If the IGMP V3 test finishes before the
ICMP echo reply packet arrives, dashes will be displayed for the
ping test results. Ping results do not affect the Pass/Fail status of
the test.
Return Code
specifies the end-of-test status or an error condition
if encountered.
At the bottom-left corner of the screen, an icon indicates the
test’s status:
A progress spinner indicates the test is in progress.
A green check mark indicates the test passed.
A red x indicates the test failed.
Tap the
TEST AGAIN
button
to re-run the test.
Содержание OneTouch AT 10G
Страница 14: ...OneTouch AT 10G User Manual xii...
Страница 135: ...Chapter 5 User Tests Video RTSP Test 133 launch a browser against the target server or Telnet SSH to the server...
Страница 146: ...OneTouch AT 10G User Manual 144...
Страница 172: ...OneTouch AT 10G User Manual 170...
Страница 173: ...171 Chapter 8 Tools Tap the TOOLS icon on the HOME screen to access the TOOLS screen Figure 64 Tools Screen...
Страница 222: ...OneTouch AT 10G User Manual 220...
Страница 225: ...Chapter 11 Maintenance Remove and Install the Battery 223 GVO003 EPS Figure 86 Remove and Install the Battery...
Страница 226: ...OneTouch AT 10G User Manual 224...
Страница 234: ...OneTouch AT 10G User Manual 232...
Страница 240: ...OneTouch AT 10G User Manual 238...
Страница 246: ...OneTouch AT 10G User Manual 6...
Страница 247: ...7 Notes...