1. Equipment installation and precautions 1.1Machine Dimension.................................................................................... 4
1.2 Structure of Neoden K1830............................................................................................................................................5
1.3Working Area Structure...................................................................................................................................................6
1.4 Important Notice.............................................................................................................................................................8
1.5 Operation flow chart.......................................................................................................................................................9
1.6 Flow chart of making a programming file................................................................................................................... 10
2.2 PCB Eject setting..........................................................................................................................................................13
After click “Eject”no matter under Mag fixture or Rail mode,the thimble will go down in “track section 2”,”track
section 3”begin to work and PCB will feed to back conveyor.......................................................................................... 13
2.3 PCB Forward Position Setting..................................................................................................................................... 13
4.2 Mark point alignment................................................................................................................................................ 18
4.3 Mark Point information.............................................................................................................................................19
6.Nozzle Information..................................................................................................................................................................30
7. Assembly Interface................................................................................................................................................................. 30
8.System Setup........................................................................................................................................................................... 34
.....................................................................................................................................................................................................34
8.1 Feeder Position Config.................................................................................................................................................35
8.2 Component Positions Setup..........................................................................................................................................36
8.3 Basic Configuration......................................................................................................................................................39
DEAR USERS
:
PLEASE READ THIS USER MANUAL COMPLETELY BEFORE
OPERATING. THIS UNIT AND RETAIN THIS BOOKLET
FOR FUTURE REFERENCE.
2
Zhejiang
NeoDen Technology Co.,Ltd.
Содержание K1830
Страница 6: ...1 3Working Area Structure Figure 3 Top view of main mounting area 6 Zhejiang NeoDen Technology Co Ltd ...
Страница 7: ...Figure 4 X axis Beam Figure 5 Main Placement Head Camera 7 Zhejiang NeoDen Technology Co Ltd ...
Страница 35: ...8 2 Component Positions Setup 35 Zhejiang NeoDen Technology Co Ltd ...
Страница 44: ...11 Structure and maintenance instruction 11 1 Feeder Brief Introduction 44 Zhejiang NeoDen Technology Co Ltd ...