42
10.
First trial and test
10.1
Program first dry run
Usually we would suggest you to have a dry run (no components are loaded) before production test. After it
goes smoothly, you can start to produce few boards.
10.2
First production test
1 Make a programming file
2 Test the file to pick and place components.
10.3
Component Inspection
Inspection items
●
Check if the specification, direction, polarity of components is aligned with what they should be.
●
Whether the components are damaged or the pins are distorted.
●
Whether the component is off beyond allowance.
The inspection methods vary from the equipment that you have.
Except visual inspection, all of amplifier, microscope, online or offline AOI equipment can be applied if the
pitch of IC is quite small to check.
Please follow SOP to do inspection or any other general standards (IPC Standard and SJ /
T10670-1995 SMT
General Technical Requirements). Adjust the programming file according to the placement
effect after the first production test.
If there is any issue of specification, direction and polarity, please follow process file to amend. If the components are
off, please adjust the file by following two methods
1. If the placement effects of all components are off in the same direction, it would be the
fiducial issues. Please resolve this issue by adjusting the coordinate of fiducials according to its value
of deviation
2. If there are several components off beyond allowance, you’d better adjust their coordinates on working file with
down-looking camera. If there are couple of issues occur during test, some other points need to be considered.
●Frequent pickup failure. Some suggestions are listed below
(1) The pick height is inappropriate, please revise the value after an inspection or a pick-test
(2) The pick offset needs an adjustment, it should be aligned with the center of component reel
Zhejiang
NeoDen Technology Co.,Ltd.
Содержание K1830
Страница 6: ...1 3Working Area Structure Figure 3 Top view of main mounting area 6 Zhejiang NeoDen Technology Co Ltd ...
Страница 7: ...Figure 4 X axis Beam Figure 5 Main Placement Head Camera 7 Zhejiang NeoDen Technology Co Ltd ...
Страница 35: ...8 2 Component Positions Setup 35 Zhejiang NeoDen Technology Co Ltd ...
Страница 44: ...11 Structure and maintenance instruction 11 1 Feeder Brief Introduction 44 Zhejiang NeoDen Technology Co Ltd ...