①
Front fixed buckle
②
Material-sending wheel gear
③
Press material cover
④
Locking Claw
⑤
Tail board
⑥
Single-track wheel
⑦
Hand Shank
⑧
Tape coiling wheel
⑨
Cylinder
⑩
Snap joint cover
11.2Installing tape and reel components
图
1
图
2
1.Making the feeder in open status to wait for installing the tape reel
①
Lift up the feeder
fixing handle
;
②
Press the material-sending handle with left hand
③
meanwhile press the
lamellule at right side of the feeder with your right hand
;
④
loosen the material-sending handle, ensure the proper wrapped
(see figure 1) then loosen the lamellule
2.Installing the tape and reel components: setting the reel on reel storage at the back side of the
feeder, pull out approximately 10cm length tape, separate the film and tape, then put into
transfer storage (see figure 1).The tape should be closely matched with the gear, and the
film should pass through the upper denomination groove (see figure 2) through two white
guide wheels and then be sandwiched between two gears.
45
Zhejiang
NeoDen Technology Co.,Ltd.
Содержание K1830
Страница 6: ...1 3Working Area Structure Figure 3 Top view of main mounting area 6 Zhejiang NeoDen Technology Co Ltd ...
Страница 7: ...Figure 4 X axis Beam Figure 5 Main Placement Head Camera 7 Zhejiang NeoDen Technology Co Ltd ...
Страница 35: ...8 2 Component Positions Setup 35 Zhejiang NeoDen Technology Co Ltd ...
Страница 44: ...11 Structure and maintenance instruction 11 1 Feeder Brief Introduction 44 Zhejiang NeoDen Technology Co Ltd ...