![background image](http://html.mh-extra.com/html/nec/neccare-platinum-express5800-a1160/neccare-platinum-express5800-a1160_installation-manual_251387071.webp)
What to Do Next
5-19
Figure 5-16 BIOS Boot Manager
c. Select
Internal EFI shell
and press
Enter
.
d. At the shell command prompt, type
PciView
.
e. Review the output to verify that the correct PCI cards are installed and visible to
the system.
f. Type
exit
to return to the BIOS front page when you are finished.
4. Power down the partition using the remote console interface:
a. Select
Power Up/Down
on the
Summary
page.
You receive a message that this is a non-graceful termination of the OS host.
b. Click
OK
.
5. Repeat steps 1 through 4 for each partition in the system.
5.6. What to Do Next
You must now do as follows:
1. Install Server Management software on your management server, if you have not
Содержание NECCare Platinum Express5800/A1160
Страница 1: ...EXPRESS5800 A1160 HW Installation Guide ...
Страница 8: ......
Страница 14: ......
Страница 28: ......
Страница 36: ......
Страница 41: ...Power Cabling for 200V to 240V Systems 4 5 4 2 1 Power Strip Cabling for a System with One Cell ...
Страница 42: ...Power Cabling for 200V to 240V Systems 4 6 4 2 2 Power Strip Cabling for a System with Two Cells ...
Страница 52: ......
Страница 76: ... 456 01805 000 ...