![background image](http://html.mh-extra.com/html/nec/neccare-platinum-express5800-a1160/neccare-platinum-express5800-a1160_installation-manual_251387023.webp)
Install the Cell Rail Assemblies
2-3
Figure 2-2 Cell Rails
Installing Rails in a Cabinet with Square-Hole Brackets
Perform the following procedure to install each set of rails. If you have a multiple-cell
system, install each set of rails for all cells before installing the cells.
1. Use
Figure 2-3
as a guide to install the rails in the cabinet. The figure illustrates the
proper placement of each rail.
Содержание NECCare Platinum Express5800/A1160
Страница 1: ...EXPRESS5800 A1160 HW Installation Guide ...
Страница 8: ......
Страница 14: ......
Страница 28: ......
Страница 36: ......
Страница 41: ...Power Cabling for 200V to 240V Systems 4 5 4 2 1 Power Strip Cabling for a System with One Cell ...
Страница 42: ...Power Cabling for 200V to 240V Systems 4 6 4 2 2 Power Strip Cabling for a System with Two Cells ...
Страница 52: ......
Страница 76: ... 456 01805 000 ...