Apply
AC Power Initially
5-4
Ensure that the connector is fully seated and the thumbscrews are completely
tightened (finger tight).
y
Power
cables
Ensure that each power cable is secure in the power supplies in the cell and that
the other end of each power cable is fully seated in the power strip connector.
y
Interconnect cable connections (0 through 2)
Ensure that the cable is fully seated in the connector and that the retaining screws
are finger-tightened.
5.3. Apply AC Power Initially
Use the procedure for your system to apply AC power.
When internal hardware checks are complete,
Figure 5-3
displays on the
EXPRESSSCOPE® Monitor LCD.
Figure 5-3 EXPRESSSCOPE® Monitor LCD After AC Power is Applied
If an error displays, verify the cabling is installed correctly. If you continue to receive an
error, contact the support center.
5.3.1. Systems
Operating at 100 to 120 VAC
Plug the cell power cords into the premises wiring (for example, the floor or wall
receptacles or the UPS receptacles).
Figure 5-4
shows the cell power cord.
Содержание NECCare Platinum Express5800/A1160
Страница 1: ...EXPRESS5800 A1160 HW Installation Guide ...
Страница 8: ......
Страница 14: ......
Страница 28: ......
Страница 36: ......
Страница 41: ...Power Cabling for 200V to 240V Systems 4 5 4 2 1 Power Strip Cabling for a System with One Cell ...
Страница 42: ...Power Cabling for 200V to 240V Systems 4 6 4 2 2 Power Strip Cabling for a System with Two Cells ...
Страница 52: ......
Страница 76: ... 456 01805 000 ...